If you are setting up a manufacturing unit, processing plant, or any workshop that employs workers and uses power, one of the first legal requirements is a factory license. Many business owners in Haryana and Delhi–NCR search for “factory license apply online” because the entire process is now digital, but the steps and documents can still feel confusing. This guide breaks it down in simple, practical language.
What Is a Factory License Certificate?
A {https://factorylicence.in}[factory license certificate] is an official approval under the Factories Act, 1948 (and state rules) that allows you to run a factory at a specific location. It confirms that your premises, machinery, safety systems, and working conditions meet the required labour and safety standards.
Without this, you can face:
Penalties and show-cause notices from the Labour Department
Problems in getting other approvals like pollution NOC, fire NOC, or Udyam registration
Issues during bank audits, buyer audits, or inspections
So, think of it as a basic “permission to operate” for any serious industrial setup.
Who Needs Factory Registration License?
You typically need a factory registration license if:
You employ 10 or more workers (with power) or 20+ workers (without power), and
You are engaged in manufacturing, processing, assembling, repairing, or similar activities.
This applies to small engineering units, food processing plants, textile units, packaging units, printing presses, and many other setups in industrial areas like Manesar, Bawal, Faridabad, Gurugram, and Bahadurgarh.
Difference Between Factory Licence and Industrial Licence
People often mix up “factory licence” and “industrial licence”.
Factory licence process is under the Factories Act and handled by the State Labour Department. It focuses on worker safety, health, working hours, and basic factory conditions.
Industrial licence (under the IDR Act, 1951) is a central government approval required only for certain specified industries like defence, aerospace, hazardous chemicals, tobacco, and a few others. Most small and medium factories do not need this; they only need factory registration and other sector-specific NOCs.
For most MSMEs, the key requirement is industrial licence registration only if your activity falls in the notified list. Otherwise, factory licence + pollution NOC + local trade licence is enough.
Factory Licence Process in Haryana – Step by Step
Here is how the factory licence process generally works in Haryana:
Visit the Haryana Labour Department portal
Go to the official Haryana Labour / Single Window portal and look for “Registration and Grant of License under The Factories Act, 1948”.Create an account
Register using your name, mobile number, and email. You will get an OTP to verify your login.Fill Form 1 / Form 2
For new factories, you usually start with Form 1 (application for permission to set up/expand).
After approval and before commissioning, you file Form 2 for the actual factory license certificate.
The online form asks for details like factory name, address, occupier details, number of workers, machinery list, horsepower, and nature of work.
Upload documents
Common documents include:Building plan approval / site plan
Proof of ownership or lease/rent agreement
List of machinery with horsepower
Details of safety measures (firefighting, first aid, ventilation, etc.)
Occupier and manager details with ID proofs
Partnership deed / MOA / AOA or proprietor declaration
Any prior NOCs if asked (pollution, fire, etc.)
Pay the fee online
Fees depend on the number of workers and total horsepower. The portal will calculate the amount, and you can pay via net banking, card, or UPI.Inspection by Labour Officer
After submission, a factory inspector may visit your site to verify layout, safety arrangements, and working conditions. If they raise observations, you must comply and submit proof.Download your license
Once approved, the factory license certificate is issued online. You can download and print it from your dashboard. Renewals are also done through the same portal before expiry.
Why Do It Early?
Many promoters delay factory registration license until the last minute, then face issues when applying for bank loans, buyer vendor codes, or pollution clearance. Doing it early, along with your building plan approval and pollution NOC, makes everything smoother.
If you want, I can draft a shorter version optimized for a service page (with CTAs like “Get your factory licence done end-to-end”) or a FAQ-style article targeting long-tail queries.
Powered by Froala Editor
You may also like
More from this category.